3B-4627: 25.40mm Long Steel Cotter Pin

3B-4627: 25.40mm Long Steel Cotter Pin

3B-5329: 101.60mm Long Steel Cotter Pin

3B-5329: 101.60mm Long Steel Cotter Pin

239-0689: 50mm Long Lead End Steel Dowel Pin

Quick Quote
Solid Dowel Pin
$4,230.77
Availability: In stock
SKU
ascm-0071336

Specification

Conditions :

New and Genuine

Packaging Regulation :

Wooden box

Shipping Time:

3~10 days

Delivery time :

7~14 days(Not included in the shipping time)

How do you order?

A&S makes ordering GET Parts easy. Simply send a mail to Us. Instead of searching online and guessing which parts you need, our team will make sure you get the correct parts. We process and deliver your order fast, and always at a competitive price. Enjoy 5-star service!


1.IDENTIFY
Determine the parts you need. To ensure the correct parts are quoted, it's best to have the machine make and model, along with part numbers and photos of the nameplate if possible. Our team of professionals are here to help ensure you get the correct parts that fit and work the first time. Our sales team can also survey and help identify the parts you may need. Please email us to get started!

2.ORDER
Our professional internal sales teams and strong supply chain system will assist you to identify the right parts, and can recommend the most cost-effective solution for you. Our team of professionals will process your order, and ensure your order is correct the first time. With over 15 years in the business, we remove the guesswork and always deliver.

3.DELIVER
We'll ship or deliver your products as required, to your nominated location. If you're also located elsewhere, we'll identify the best shipping options for both price and delivery time. Email us now!

Okmarts | Piezas de reparación de maquinaria de construcción
Description:
Dowel pins are headless straight pins with a closely controlled diameter used to transmit load or to position adjacent parts by being press fitted in one or both parts. Fastener & hardware parts are designed for specific applications based on size, strength, clamp load, and past performance. This is information other manufacturers do not have. They are selected to last until rebuild or the life of the machine. While it may seem as though non-Cat hardware and fasteners are suitable for your machine, no other company knows your equipment like we do.
More Information
Short Description Solid Dowel Pin
Write Your Own Review
You're reviewing:239-0689: 50mm Long Lead End Steel Dowel Pin
Your Rating